Pump Controller

Before you start building the controller, you will need to source all the components listed in our bill of materials (HTML, CSV), which is given on the next page.

Instructions

These instructions will take you through how to assemble the controller and install the firmware:

  1. Print the plastic parts
  2. Assemble the front panel
  3. Implement the electronics
  4. Assemble everything together
  5. Firmware Installation
  6. Using the Syringe Pumps

Next page